The installation of a 99.8kW solar system at the Kingsmeade head office in Mcmahons Point has been a significant step towards sustainability. This system has not only reduced the office’s reliance on grid electricity but also substantially cut down their carbon footprint. By harnessing the power of the sun, Kingsmeade is now able to generate a substantial portion of its energy needs in-house, leading to considerable savings on energy bills. This system is expected to generate approximately 142,000 kWh of electricity per year and remove 152t CO2e per year. The installation of this solar system has helped Kingsmeade head office to become more environmentally friendly and sustainable, while also reducing their energy costs. By using solar energy, Kingsmeade head office is able to reduce their reliance on non-renewable energy sources and contribute to a cleaner and greener future.

Location

North Sydney

Commissioning Date

12/09/2023

System Size (kW)

99.795

System Annual Yield (MWh)

142

CO2e

152

Category
Concrete Roof
Tags
North Sydney