Stacked multi-Powerwall systems must be floor-mounted and must be anchored to an adjacent wall. The wall must be capable of supporting the lateral load of the Powerwall stack.
A maximum number of 3 floor-mounted Powerwall units may be joined together with two Powerwall Stack Kits. For systems with more than 3 Powerwalls, separate groups of 3 units should be assembled, with each group of 3 attached to a wall.
File | Action |
---|
Powerwall multi stack kit Aug 2020 Datasheet_compressed.pdf | Download |
Sorry, the comment form is closed at this time.