Mid-scale solar is now legislated

Major Policy Update: Mid-Scale Solar Incentives Expanded Up to 1 MW

Changes to the Renewable Energy (Electricity) Regulations mean commercial systems up to 1 MW will soon qualify for expanded solar PV incentives under the Small-scale Renewable Energy Scheme (SRES).

Key Takeaways for Commercial & Industrial Property Owners

Expanded Eligibility
The eligible capacity threshold for solar PV systems under the scheme has officially been expanded from 100 kW up to 1 MW.

Key Dates
These changes apply to eligible mid-scale solar systems installed from 1 October 2026.

Application Window
Official applications are expected to open in mid to late November 2026. Systems installed on or after 1 October 2026 remain fully eligible to apply retroactively once applications open.

What Does This Mean for Your Business?

For commercial facility managers, enterprise leaders, and asset owners, this legislative shift substantially improves the return on investment (ROI) for mid-scale solar systems. By lifting the limit beyond 100 kW to 1 MW, medium-to-large commercial arrays—such as those installed on manufacturing facilities, logistics hubs, shopping centres, and multi-storey commercial complexes, can now benefit directly from expanded regulatory incentives.

Lowering upfront capital friction makes high-capacity commercial solar projects an even more compelling pathway toward operational cost reduction, grid volatility insulation, and long-term ESG compliance.

Navigating the Transition with Australia Wide Solar
Engineering and installing commercial solar arrays at this scale requires precise technical design, structural assessment, and seamless grid integration. With over 3 decades of solar design, engineering, and installation experience, Australia Wide Solar provides the enterprise-grade expertise needed to capitalize on these legislative updates:

Tailored System Engineering
Custom-engineered PV and battery solutions tailored to your facility’s load profile and site constraints.

Compliance & Grid Connection
Complete management of grid approvals, compliance standards, and legislative incentive documentation.

Maximizing Financial Yield
Ensuring your system is designed and installed to take immediate advantage of the new 1 MW threshold once applications open in November 2026.

Ready to Capitalize on the New 1 MW Threshold?

If your enterprise has been considering a mid-scale or commercial solar project, now is the time to finalize design specifications and site surveys to prepare for the October 1 eligibility rollout.

Contact Australia Wide Solar today to discuss your project requirements with our engineering team.

Phone: (02) 9533 7444   Location: 34/17-37 Lorraine Street, Peakhurst, NSW 2210

Related Posts

Loadshifting or Time-Based Control

Time-Based Control Time-Based Control (also referred to as load shifting) helps you maximise savings through smart charging and discharging of your battery. If your electricity prices vary during the day, you are likely on a Time-of-Use rate plan, and Time-Based Control would present the best

Read More